Generation Units Table
Pre-optimization unit parameters
Unit Fuel Technology Capacity
(MW)
Min Load
(MW)
Ramp
(MW/min)
Spin Res
(MW)
Freq Res
(MW)
Price
(NIS/MWh)
GAS_1 GAS CCGT 100 30 1.67 0 0 100
GAS_2 GAS CCGT 80 25 1.67 0 0 150
GAS_3 GAS SIMPLE_CYCLE 70 20 1.67 0 0 200
GAS_4 GAS SIMPLE_CYCLE 60 20 1.67 0 0 250
GAS_5 GAS SIMPLE_CYCLE 50 20 1.67 0 0 300
System Parameters
Time Horizon 1 intervals (0.5h)
Interval Duration 30 minutes
Spinning Reserve (Up) 0 MW
Spinning Reserve (Down) 0 MW
Frequency Reserve 0 MW
Value of Lost Load 100000 NIS/MWh
Coal Priority Dispatched Last
Demand
Total Demand 210 MW