Renewable Integration
Solar at zero marginal cost dispatches first, reducing thermal generation needed. But the MCP is set by the marginal thermal unit, not zero.
Generation Units Table
Pre-optimization unit parameters
| Unit | Fuel | Technology | Capacity (MW) |
Min Load (MW) |
Ramp (MW/min) |
Spin Res (MW) |
Freq Res (MW) |
Price (NIS/MWh) |
|---|---|---|---|---|---|---|---|---|
| SOLAR_1 | RENEWABLE | SOLAR | 60 | 0 | 2.0 | 0 | 0 | 0 |
| GAS_1 | GAS | CCGT | 100 | 30 | 1.67 | 0 | 0 | 100 |
| GAS_2 | GAS | CCGT | 80 | 25 | 1.67 | 0 | 0 | 160 |
| GAS_3 | GAS | SIMPLE_CYCLE | 50 | 15 | 1.67 | 0 | 0 | 220 |
System Parameters
Time Horizon
1 intervals (0.5h)
Interval Duration
30 minutes
Spinning Reserve (Up)
0 MW
Spinning Reserve (Down)
0 MW
Frequency Reserve
0 MW
Value of Lost Load
100000 NIS/MWh
Coal Priority
Dispatched Last
Demand
Total Demand
220 MW
Running Optimization
✓ Initializing solver...
○ Unit commitment (MILP)...
○ MCP extraction (LP)...