Storage Battery

A battery starts near empty. It charges when prices are low (100 NIS/MWh) and discharges when prices are high (200 NIS/MWh). Temporal arbitrage in action.

Generation Units Table
Pre-optimization unit parameters
Unit Fuel Technology Capacity(MW) Min Load(MW) Ramp(MW/min) Spin Res(MW) Freq Res(MW) Price(NIS/MWh)
GAS_1 GAS CCGT 120 30 2.0 0 0 100
GAS_2 GAS SIMPLE_CYCLE 80 25 2.0 0 0 200
System Parameters
Time Horizon 3 intervals (1.5h)
Interval Duration 30 minutes
Spinning Reserve (Up) 0 MW
Spinning Reserve (Down) 0 MW
Frequency Reserve 0 MW
Value of Lost Load 100000 NIS/MWh
Coal Priority Dispatched Last
Demand Profile