Coal Participation

Coal is dispatched but excluded from setting the MCP per market rules. The highest purchased gas price becomes the MCP.

Generation Units Table
Pre-optimization unit parameters
Unit Fuel Technology Capacity(MW) Min Load(MW) Ramp(MW/min) Spin Res(MW) Freq Res(MW) Price(NIS/MWh)
GAS_1 GAS CCGT 250 200 0.01 40 30 150
GAS_2 GAS CCGT 100 70 0.07 20 20 170
GAS_3 GAS CCGT 150 100 0.03 50 30 180
COAL_1 COAL CCGT 340 320 0.17 0 0 190
GAS_5 GAS CCGT 120 80 0.1 40 20 250
System Parameters
Time Horizon 1 intervals (0.5h)
Interval Duration 30 minutes
Spinning Reserve (Up) 130 MW
Spinning Reserve (Down) 130 MW
Frequency Reserve 100 MW
Value of Lost Load 100000 NIS/MWh
Coal Priority Dispatched Last
Demand
Total Demand 810 MW