Coal Participation
Coal is dispatched but excluded from setting the MCP per market rules. The highest purchased gas price becomes the MCP.
Generation Units Table
Pre-optimization unit parameters
| Unit | Fuel | Technology | Capacity (MW) |
Min Load (MW) |
Ramp (MW/min) |
Spin Res (MW) |
Freq Res (MW) |
Price (NIS/MWh) |
|---|---|---|---|---|---|---|---|---|
| GAS_1 | GAS | CCGT | 250 | 200 | 0.01 | 40 | 30 | 150 |
| GAS_2 | GAS | CCGT | 100 | 70 | 0.07 | 20 | 20 | 170 |
| GAS_3 | GAS | CCGT | 150 | 100 | 0.03 | 50 | 30 | 180 |
| COAL_1 | COAL | CCGT | 340 | 320 | 0.17 | 0 | 0 | 190 |
| GAS_5 | GAS | CCGT | 120 | 80 | 0.1 | 40 | 20 | 250 |
System Parameters
Time Horizon
1 intervals (0.5h)
Interval Duration
30 minutes
Spinning Reserve (Up)
130 MW
Spinning Reserve (Down)
130 MW
Frequency Reserve
100 MW
Value of Lost Load
100000 NIS/MWh
Coal Priority
Dispatched Last
Demand
Total Demand
810 MW
Running Optimization
✓ Initializing solver...
○ Unit commitment (MILP)...
○ MCP extraction (LP)...